Spreading the Message

Variable message sign for the Labor Day 2007 closure of the San Francisco Bay Bridge

Variable message signs throughout the Bay Area displayed this message in August 2007, leading up to the closure of the Bay Bridge during the Labor Day weekend. The bridge was closed as part of continuing seismic retrofitting. The bridge actually re-opened 11 hours ahead of schedule, on Labor Day Monday, September 3, at 6 pm.